
Company history
Establishment of the engineering center
Russian Railways (RZD) and the Sinara group of companies incorporated the Railway Transport Engineering Center.


Domestic high-speed rolling stock programme
Launch of domestic high-speed train development programme.
Infrastructure development center established
A new infrastructure development track opened; catenary and permanent-way programmes commenced.


Forward-looking projects center established
A new innovative rolling-stock development track opened. Hydrogen and hybrid locomotive programmes launched.
ECRT trials at the VNIIZHT Experimental Ring
Endurance trials began on ECRT-developed permanent-way engineered for an accumulated gross tonnage of 2.5 billion tonnes, on the VNIIZHT Experimental Ring.


High-speed train basic design completed
Core technical solutions were developed for Russia’s first domestic high-speed electric train.
ECRT trials on the RZD network
Field trials began on ECRT-developed permanent-way engineered for an accumulated gross tonnage of 2.5 billion tonnes — on a section of the Krasnoyarsk Railway, an RZD branch.


Detail design completed and high-speed train production started
Engineering documentation for Russia’s first domestic high-speed electric train was completed; carbody fabrication started at the Ural Locomotives plant.
Core areas of work
Rolling stock development
Rail infrastructure development
Research into forward‑looking priorities
Import substitution of technical solutions on the railway network

Alexander Kireytsev
General Director
The mission of JSC ECRT is to create modern, safe, and reliable solutions for railway rolling stock, as well as subsystems and infrastructure assets, using advanced technologies. We will keep building competencies step by step until our developments rank among the best in the world.
