Skip to content
High-speed electric train EVS-360 — ECRT project

High-speed electric train EVS-360

High-speed electric train platform for the first HSR line Moscow – Saint Petersburg: a joint engineering and production programme with phased delivery of trains for testing and certification.

Train characteristics

The electric train is intended for operation on the first HSR line Moscow – Saint Petersburg. Dual-system operation for 3 kV DC and 25 kV AC is provided.

  • 400km/h

    Maximum speed on HSR

  • 360km/h

    Maximum operating speed on HSR

  • 8cars

    Consist with double-traction capability

  • 452passengers

    Total passenger capacity

  • −40…+40°C

    Operating temperature range

Service classes

The train offers four comfort levels for passengers. Meeting compartments are also provided. Design is developed with modern trends and operating experience of the Sapsan electric train in mind.

  • First

    service class

  • Business

    service class

  • Comfort

    service class

  • Standard

    service class

Schedule and key milestones

ECRT is the lead developer — design documentation has been developed since 2020 under contract with Russian Railways. Design follows an agreed work plan. In April 2024 a contract was signed for delivery of two lead prototypes with fixed deadlines for transferring design documentation to the manufacturer.

  • 2023

    Preliminary design

  • 2024

    Technical design

  • 2025

    Start of component manufacturing

  • 2026

    Detailed design

  • 2027–2028

    Testing and certification

Programme scale

Domestic companies are prioritised for project implementation. New designs and technologies are being developed for individual systems. The electric train manufacturer is Ural Locomotives. Transmashholding enterprises are involved in the project.

  • 36systems

    New systems for the high-speed electric train

  • >10 000parts

    Components in the train structure

  • ≥85%

    Planned share of domestically sourced parts

  • 160+organisations

    Enterprises, research institutes, and design bureaus involved in development and production

Characteristics and indicators — based on materials from the round table "On the readiness of Russian industry sectors for the Moscow – St Petersburg HSR project", Federation Council, 9 December 2024.

High-speed electric train EVS-360