Clamp calculations
Optimisation of clamp geometry considering durability, natural frequency, and clamping force. Design stiffness of the fastening node is assessed separately.

ECRT is developing rail fastenings for railway track on a ballastless subgrade for the first HSR line Moscow – Saint Petersburg
ECRT is carrying out a comprehensive programme to develop an intermediate rail fastening node for the HSR-1 track superstructure.
2026
Planned conformity certificate for the HSR-1 fastening node
2026
Installation of prototype samples and testing at the Sablino – Tosno test site
In parallel, development and manufacture of elements for variable-stiffness sections is under way. At PMS-88, track panel assembly is in progress for installation and testing at the Sablino – Tosno test site; acceptance tests with release "O1" are being conducted.
2027
Planned completion date
For the EVS 360 programme, the calculation framework links the train, track, and fastening elements — from clamp geometry to node behaviour within the track superstructure.


Optimisation of clamp geometry considering durability, natural frequency, and clamping force. Design stiffness of the fastening node is assessed separately.


Calculation of rolling stock loads on the node, accounting for track dynamics and various train–infrastructure interaction scenarios.

Verification of the fastening node for strength and durability using a computational mesh and an engineering contact model of the components.

Calculation of the node within the track superstructure, assessing rail stiffness and the elastic modulus of the sub-rail foundation.